Jacksonville Jaguars Indoor Practice Facility

Jacksonville, FL
Builder
Harrell Construction Co, Inc.
Building Use
Indoor Practice Facility
Project Size
98,000 sq. ft.
Products Used



Completion Date
February 2023

Opening in 2023, Miller Electric Center is the new performance center for the Jacksonville Jaguar football team. The two-story facility includes one indoor practice field and two full-size grass fields for outdoor practice. Additionally, there are training and medical facilities, locker rooms, meeting rooms, office space, and a draft room. The Jaguar’s performance center is recognized as a 2024 Hall of Fame Best of Category Winner in Recreation.

The practice facility was erected using a 220′-0″ clear span – 420′-0″ long and 98′-0″. The SSR ™ roof with clerestory framing used Kingspan Light+Air UniQuad translucent panel walls which provided natural light and were also used with the ThermalClad/TuffWall insulated wall panels. The project was on time and within budget.