Completed in January 2021, this two-story pre-engineered metal building features a bar joist with 26 ga deck mezzanine. A bronze Standing Seam roof was incorporated into the building design, as well as R-30 roof insulation with full liner panel, and R-19 wall insulation over reverse roll panel rib. The main finishing materials include synthetic stucco.