Waco Aircraft Corp.

Battle Creek, MI

Builder
Pioneer Construction
Building Use
Parts Manufacturing
Project Size
66,300 sq. ft.
Products Used
Continuous Beam Frame
SSR™ Roof System
ThermaClad™ Wall System
Completion Date
December 2020

Four buildings were erected simultaneously during this project – two hangars, a fabrication shop, and an engine building. All buildings utilized VP’s ThermoDeck roof system and ThermaClad™ wall system.

For a more architectural look, two of the buildings also had horizontal ThermalClad. ThermoDeck was a new system for the Pioneer team to use, so the group had to learn along as they went, during installation. The result was a success, as it turned out to be an excellent, clean system that the owners were thrilled with!