Florida Baptist Children's Homes - H.C. Simmons Compassion Center

Lakeland, FL
Builder
Canco General Contractors, Inc.
Building Use
Donation Center for seven FL campuses
Project Size
17,400 sq. ft.
Products Used

Completion Date
September 2016

This building uses Continuous Beam framing system with hipped endwalls. A 1,700 sq. ft. second floor system, 13’ x 91’ food freezer / cooler, a 3,500 sq. ft. office and counseling center and a 2,000 sq. ft. clothing boutique for clothing for children and families make up the building. The building also features two canopies-a covered entrance drive and loading dock area for shipments to orphanages in other countries. EIFS on steel studs was used on the exterior walls of the structure. A few sustainable elements to the building include R-24 roof insulation and R-19 wall insulation systems, LED lighting, SEER 14 rated AC system with duct sock, 1” insulated glass and two low speed, high volume fans.