GreenStone Gold Mines

Geraldton, ON, CA
Builder
SteelCan Building Systems Ltd.
Building Use
Process/Mill Building
Project Size
85,000 sq. ft.
Products Used



Completion Date
February 2024

The building has three roof levels, using VP Rigid Frames and lean-to frames supporting multiple cranes at each level, between 5 to 46 tons. Multiple mezzanines and columns are spliced from four sections to a high eave of 129’— a major challenge during steel erection with cold temperatures dropping to -40, wind, and snow. This project was recognized as a 2024 Hall of Fame Winner in the Manufacturing category.

Solutions Archive.

RELATED

Projects